Kharaujha Builders Pvt. Ltd.

Introduction

 

SURYA VILLA PHASE- 4 is the latest project by the SURYA GROUP. It is a multi-storied residential complex, that is  scheduled to be completed in March 2011.

Floor Plan

Parking Plan

 

Floor Plan:

 

 

Location

Surya Villa Phase Four is located in Birdopur, Mahmoorganj, Varanasi.

 

Links  

Specification
Terms and Condition

 

 

Surya Villa Phase Four

Accommodation  

Type A B C
 Bedrooms 2 2 3
 Study Rooms Nil 1 Nil
 Toilets 2 2 2
 Kitchen 1 1 1
 Balcony 3 3 3
Dwg./Dining 1 1 1
 Super Built-up Area in Sq Ft. 1003 1159 1290


Accomm-odation S/B Area 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor
3 BHK 1290 101 201 301 401 501
3 BHK 1290 102 202 302 402 502
2 BHK 1003 103 203 303 403 503
2.5 BHK 1159 104 204 304 404 504

Facilities

Parking Area:
Covered parking is available on ground floor on payment basis.

Security:
Round the clock security will be provided at the entrance where a guardroom will be constructed.

Water Supply:
Our own tube well and O/H tanks will assure 24 hours water supply.

Generator and Inverter:
Approx. 500 watts of power will be provided to each flat for its own  inverter. Captive Diesel generator will provide power back-up for lift, pump and common area lighting.

Lift:
A 5-passenger lift will be installed which will also be powered by generator.

Community Hall:
One Air-conditioned community hall of approx 600 Sq. Ft. will be provided for functions and meetings on the ground floor.

Note: All the common facility will be provided by the company but its regular maintenance will be done by the flat owners through a society / association to meet the regular maintenance cost. However, till such association comes into existence the company will maintain the facilities and the flat owners will be bound to pay the maintenance charges.

?Kharaujha Builders Pvt. Ltd. all right reserved